McCord Contractors - Industrial Flooring and Coating Specialists
McCord Contractorsflooring optionsabout usgalleryapplicationsfrequently asked questionsother servicescontact us
FlooringPaintingCase Studies

Case Studies


Case Study 3: Waterproofing Deck System

The existing urethane membrane on this hospital parking deck had failed and was allowing water to leak in to the office spaces below. We started the repairs by removing the old membrane using UHP water blasting, diamond tooling and a Skid Steer mounted scraper blade. Once all the old coating had been removed (approximately 70,000 square feet) the transition joints at the curbing as well as the expansion joints were routed with a diamond blade and sealed using two-component urethane joint fillers. Curbing was re-tooled using non-sag caulking materials. A new urethane membrane was applied in a three-coat system. The parking deck remained open throughout the process. The urethane membrane is a product of The Sonneborne Company.

1: Self-Leveling Epoxy
2: Impact Resistent Epoxy
3: Waterproofing Deck System
4: Non-Skid Epoxy
5: Moisture Remediation System
6: Decorative Quartz with Integral Cove Base

 

  7: Polished Concrete
  8: Cementitious Mortar
  9: Decorative Concrete Stain
10: Acid Stain

Home | Flooring Options | About Us | Gallery | Applications | FAQ's | Other Services | Contact 3299 Frog Level Road Greenville, NC 27834
©2012 McCord Contractors, Inc.